P-01 — Design foundation · 2026 · in study

Ecobrutalismo

Heavy — raw — alive. In that order, all at once.

Vision

[ 01 / 10 ]

A 269 m² single-family house built as in-situ board-marked concrete on a 6.6 m Soviet-inspired grid, in which vegetation, water, and seasonal reversal function as structural and climatic partners rather than decoration. The building is designed to be colonized — moss on engineered bands, wisteria on loaded cable nets, rain on an audible water chain — within verified engineering tolerances and a contractual 50-year maintenance doctrine.

Design principles

[ 7 BINDING ]
  1. 01

    Frame and infill D-002

    100-year concrete frame carrying 30-year bolted CLT cells; adaptability without demolition is the deepest ecological act.

  2. 02

    Deep planted loggias D-005

    1.8–2.4 m recesses as composition, solar instrument, and vegetal body at once; deciduous vines as motorless seasonal actuators.

  3. 03

    Mass inside, insulation outside D-006

    ≈ 89 t of actively cycled concrete, ≈ 175 kWh per charge/discharge cycle; buffers stand outside the thermal line.

  4. 04

    All water visible D-007

    Roof → chains → open channels → 2 × 10 m³ cast cisterns → troughs → swale. Storms are scheduled events, not emergencies.

  5. 05

    Zoned colonization D-009

    Moss invited on north bands, neutral elsewhere, prohibited on water faces. The bio-receptivity/durability conflict is resolved spatially, not by compromise.

  6. 06

    Three clocks D-010

    Geological (100+ yr), gardener (5–25 yr), mechanical (10–35 yr). No mechanical replacement may ever touch concrete.

  7. 07

    One street touches every room once D-012

    The Soviet internal-street principle at domestic scale; four equal cells hold the private program against the asymmetry of the collective frame.

Spatial organization

[ SCHEME 1 ]

Scheme 1 — the Horizontal Kommunalka — selected over two alternatives on service economy, structural directness, and the absence of transfer structures. Ground floor: a continuous public band — entry → kitchen-factory → dining → 6.2 m double-height living hall → two-story winter-garden prow that terminates the 33 m axis on a fig tree. Upper floor: four equal 6.6 × 3.5 m cells with private planted loggias, plus a top-lit, thermally independent workspace.

Six outdoor rooms, gradient-ordered from the raingarden swale to the roof meadow. No room opens onto none.

Structural & civil engineering

[ EN 1992 / 206 ]

Load path: saturated roof meadow (5.0 kN/m² design) → 320 mm flat slabs on 6.15 m spans → six 400–450 mm cross walls acting as shear walls in both directions → 600–800 mm waffle mat. Trough edge beams carry 12–14 kN/m of saturated line load, triple-barrier waterproofed, flood-tested before planting. A 5.0 kN/m² services reserve in every slab protects the 30-year renovation scenario. There are no transfer structures anywhere.

Water balance: ≈ 283 m³/yr yield against ≈ 105 m³/yr demand — the surplus is routed visibly and exercises the swale by design. Concrete in four EN 206 mix families (GGBS 50–80%); formwork strikes only on maturity-method verification.

Material & aging strategy

[ 20–50 YR ]

Aging is specified, not feared. Carbonation advances 2–5 mm/yr against 45–50 mm of cover. Arrises soften ~1 mm in twenty years. Moss on north bands reaches 60–80% cover by year 10–15 — at which point commissioning is complete. A vascular plant rooted in a frame wall is a defect; lichen on south faces is welcome after year ten.

Maintenance is two registers under contract: the wild — pruned, fed, never sanitized — and the controlled — zero tolerance, where repeated intrusion triggers a detail fix, not more weeding. Sensory qualities are contractual: petrichor off the plinth, the rain chain as the house's instrument, one touchable moss band, no decorative exterior lighting.

Research & precedents

[ 27 CANON / 15 CASES ]

Verified tooling: Ladybug/Honeybee → EnergyPlus, EPA SWMM, WUFI hygrothermics, Karamba3D, L-Py growth simulation, EC3/ICE carbon data. Bio-receptive concrete at the current state of the art is empirical — TU Delft formulation work and panel testing; no predictive colonization tool exists, so biology is verified physically.

The canon that governs: the Barbican (designed patina), ACROS Fukuoka (terrace as structure), Narkomfin (frame, infill, and its documented wall-garden), Igualada (mass as geology), Ricola Kräuterzentrum (mass-wall humidity buffering), La Mémé (fifty years of frame, infill, and vine). The defining negative case: Robin Hood Gardens — vegetation fails where construction, budget, and maintenance never made it structural.

Status of deliverables

[ 16 DOCS ]
DocContentLevelState
01–02Manifesto; five massing conceptsConceptComplete
03Materials and tectonicsSpec-intentComplete
0427-reference canonCanonComplete
05Research report — verified links, no simulations runReportPartial
06Spatial organization — scheme fixed, no drawingsSchemePre-drawing
07Structural/civil — indicative sizing, not code-checkedSizingPartial
08Digital workflow — defined, scripts unwrittenStackPartial
09/15Visualization prompts + first vector platesPromptsFirst pass
10Aging and junction doctrineDoctrineComplete
11/13Narrative; executive summaryNarrativeComplete
12Decision log D-001–D-014GovernanceLive
14–16Site brief (queued); render log; cost modelEstimateClass 5

Documents — source set

  1. 01Manifesto — The Green Brut
  2. 02Massing concepts — five statuses of weight
  3. 03Material and tectonic strategy
  4. 04Reference canon — built and theoretical precedents
  5. 05Research report — tooling, precedents, risk register
  6. 06Spatial organization and layout
  7. 07Structural and civil engineering concept
  8. 08Digital design-to-construction workflow
  9. 09Visualization strategy and rendering prompts
  10. 10Aging, material and detail strategy
  11. 11Project narrative — client presentation
  12. 12Decision log
  13. 13Executive summary — source of this page

Critical open questions

[ 8 GATES ]
  1. Q1

    The site — master gate on ~40% of content: geotech, infiltration, rainfall record, latitude. D-015 pending

  2. Q2

    WUFI transient runs of every wall build-up — the stack-up stands or falls here. Pre-tender, mandatory.

  3. Q3

    First cost reality against the declared sacrifice order: formwork rhythm → trough depth → M3 bands. Mass, street, water chain never.

  4. Q4

    Scheme lock vs. reopen on the real site.

  5. Q5

    Planting palette — regional species verification and invasive-law check for every assumed specimen.

  6. Q6

    Six test panels, three-winter exposure — commissioned the day the site is secured.

  7. Q7

    Photorealistic visualization pass — the project is currently untested in image.

  8. Q8

    Code package: fire strategy, acoustics, local energy code mapping. Unstarted.

Bottom line

[ 10 / 10 ]

A complete, internally consistent, buildability-first design foundation — ready for its site, and honest about what the site will change.